EPCOM Certified Products
We test, inspect and restore all EPCOM products to working conditions.
Stock | Classification | Your Price |
---|
Optional Accessories
Product Specifications
Calendar: See Event Dates.
Requisites:
Basic desk equipment, pen, notebook, etc.
Register to assist to the course
Duration: 1 day.
Schedule: 9:00 ~ 12.30 and 14:00 ~ 18:00
Who is it for:
SYSCOM distributors wishing to integrate systems with telecommunication towers interested in a complete and efficient infrastructure without risk to the installer or people close to the area.
Upon completion the Participant will be able to:
-
Select the necessary components to build a tower.
-
Validate that the structure will resist safely according to the desired integration.
-
Detect additional requirements for tower installation, such as obstruction lights, physical ground systems, and more.
Course Syllabus:
- Introduction to Lifting Equipment.
- Equipment elevation start.
- Importance of systems.
- Integrations that require height.
- Basic Concepts
- Guyed towers.
- Self Supporting towers.
- Radio.
- Antenna.
- Hardware.
- Foundation.
- Defining Galvanized
- Galvanized theory.
- Electro-galvanized.
- Hot-dip galvanized (NMX-H-004-SCFI-2008)
- Fundamental differences.
- Acceptable and unacceptable defects.
- Types of Elevation Equipment.
- Natural elements.
- Guyed tower.
- Self Supporting towers.
- Fixed telescopic masts.
- Retractable telescopic mast.
- Non-penetrating bases.
- Special structures.
- Guyed Tower Selection
- Special characteristics.
- Basic components.
- Complementary components
- Tower kits.
- Complying with regulations.
- Self Supporting Tower Selection
- Special Characteristics
- Design norm ANSI/TIA-222.
- Line TBX.
- Line RSL.
- Line SSV.
- Masts
- Special Characteristics.
- Mast kit.
- Grounding and Lightning Rod Systems
- General concepts.
- Grounding systems.
- Conventional lighting rods.
- PDC lighting rods.
- Active lighting rods.
- Other systems.
- Complying with regulations.
- General installation advice for telecommunication towers.
- Pre-installation.
- During the installation.
- Post-installation (maintenance).
- Standards.
- NMX-H-004-SCFI-2008
- CODA-001-2010, NOM-015-SCT3-1995.
- NOM-009-STPS-2011
- NOM-001-SEDE-2012
- Final Comments.